Hydrocarbon generation system and hydrocarbon generation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11795121
APP PUB NO 20220332663A1
SERIAL NO

17857255

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrocarbon generation system includes a first generation apparatus configured to generate a hydrocarbon with two or more carbon atoms from a first raw material containing: at least one of carbon monoxide or carbon dioxide; and hydrogen. The hydrocarbon generation system includes a second generation apparatus configured to generate methane from a second raw material including: hydrogen; and at least one of carbon monoxide or carbon dioxide contained in the first raw material and discharged from the first generation apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IHI CORPORATION1-1 TOYOSU 3-CHOME KOTO-KU TOKYO 135-8710

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Wonyoung Tokyo, JP 16 10
Kamata, Hiroyuki Tokyo, JP 69 421
Nariai, Kentaro Tokyo, JP 8 8
Suda, Toshiyuki Tokyo, JP 33 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00