Hybrid cable/rail transportation system, transportation unit for such a transportation system and method for operating such a transportation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11801875
APP PUB NO 20210031811A1
SERIAL NO

17044168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid cable/rail transportation system comprising: at least one system portion configured as a cable transportation system comprising at least one cable; at least one system portion configured as a rail transportation system comprising at least one rail, wherein the system portion configured as a cable transportation system is upstream and/or downstream of the system portion configured as a rail transportation system; a plurality of transportation units, wherein each transportation unit comprises a cabin; wherein each cabin is configured for being moved along the entire system, respectively supported hanging from the cable along the system portion configured as a cable transportation system and supported resting on the rail along the system portion configured as a rail transportation system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEITNER S P A39049 VIPITENO (BZ)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Conte, Giuseppe Bolzano, IT 36 231
Erharter, Nikolaus San Candido, IT 14 39
Wieser, Hartmut Racines, IT 7 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00