Method of installing liner assembly for pipeline repair or reinforcement, and liner assembly and steam generator for same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11802648
SERIAL NO

17520193

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam generator for use with a liner assembly for pipeline repair or reinforcement, includes: a water heater configured to heat water to generate steam; a water feed conduit configured to convey water to the water heater; an air heater configured to generate heated air; an air supply conduit configured to convey pressurized air to the air heater; a heated air supply conduit configured to convey heated air from the air heater to the water heater to yield a steam-air mixture; and an output conduit configured to convey the steam-air mixture from the water heater. An automated steam generator system including the steam generator is also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NU FLOW TECHNOLOGIES 2000 INCAJAX ON L1S 1R8

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corneil, Paul Ajax, CA 3 0
Duxbury, Grant Ajax, CA 3 0
Manners, Cameron Ajax, CA 10 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00