Production of glass from a mixture comprising calcium oxide, and glass furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11807567
APP PUB NO 20200156980A1
SERIAL NO

16625953

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a glass production method comprising the production of a glass precursor mixture for a glass furnace, in which water, sand and sodium carbonate are mixed in weight proportions of between 0 and 5%, 40 and 65%, and greater than 0 and at most 25% respectively, and, after at least 10 minutes, calcium oxide is added in a weight proportion of between 1 and 20% of the total. The invention relates to a method for producing glass using a mixture containing, in particular, calcium oxide, and a glass melting furnace, said method and furnace using a burner with a flame directed at the glass batch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARC FRANCE62510 ARQUES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bonningues, Jean-Marie Arques, FR 3 2
Charles, Herve Arques, FR 2 1
Donze, Sebastien Arques, FR 3 1
Famchon, Francois Arques, FR 2 1
Ibled, Xavier Arques, FR 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00