Construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11808008
SERIAL NO

17425510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A construction machine is capable of reducing a decrease in work efficiency due to maintenance for capturing dust. The construction machine includes: an engine; a heat exchanger; a cooling fan that sucks air into an engine chamber to pass the air through the heat exchanger; an intake chamber independent of the engine chamber; an intake tube connected to the intake chamber; and a dust receiving part. The intake tube has a curved part, which has an outside inner wall surface allowing dust in the air to contact it. The dust receiving part is located downstream of the outside inner wall surface to be capable of receiving dust.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CONSTRUCTION MACHINERY CO LTDHIROSHIMA-SHI HIROSHIMA 731-5161
HIROSHIMA UNIVERSITYHIGASHIHIROSHIMA-SHI HIROSHIMA 739-8511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Hideki Hiroshima, JP 392 2921
Hirayama, Michio Hiroshima, JP 28 120
Iji, Taira Hiroshima, JP 4 1
Kumitani, Kenjiro Hiroshima, JP 2 1
Nakahara, Ryota Hiroshima, JP 2 1
Shimada, Manabu Hiroshima, JP 12 423

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00