Method for assembling a building using concrete columns

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11808025
SERIAL NO

17836437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete and steel insulated building is constructed by forming excavated holes and inserting into each hole a 3-dimensional reinforcing bar cage having a length so as to define reinforcement for a pile and to stand upwardly of the hole to a height above the hole to provide reinforcement for a column having a height of the building wall. The pile is formed by casting concrete into each hole around the cage and setting the material so as to define an upper surface of the pile at or above the ground. With the pile set, a formwork is defined by a series of stacked openable form components standing upwardly and a further body of concrete is cast into the formwork to form the column which is integrated with the pile by the cage. A roof and insulated walls are applied on the building supported by the columns.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANAMERICAN CORRUGATING CO LTDPO BOX 9 #1 CAN AM ROAD MARGARET R0K 1J0

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Waldner, Paul Margaret, CA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00