Concrete cutting machine and sliding plate assembly for a concrete cutting machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11813772
APP PUB NO 20200406503A1
SERIAL NO

16908281

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete cutting machine, for wet and dry dual-use cutting, includes a saw blade, which is configured to cut concrete, a motor, which is configured to drive the saw blade to rotate about a first axis, and a bottom plate, which is configured to support the motor and the saw blade. The bottom plate is formed with a first cutting space for the saw blade to pass through. The concrete cutting machine further includes a sliding plate assembly, which is at least partially disposed in the first cutting space, to form a second cutting space smaller than the first cutting space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING CHERVON INDUSTRY CO LTDNANJING JIANGSU 211106

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chua, Bun Hiong Nanjing, CN 3 3
Lai, Meixiong Nanjiang, CN 2 2
Lan, Ran Nanjing, CN 3 0
Richard, Monteverde Nanjing, CN 1 0
Zhang, Hua Nanjing, CN 534 3218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00