Cutting assembly for trimming pieces of meat, processing system including such a cutting assembly, and corresponding methods of operating and use associated thereto

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11819034
APP PUB NO 20200236953A1
SERIAL NO

16633771

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cutting assembly and corresponding workpiece processing for cutting a workpiece, the cutting assembly including a first cutting tool adapted to cut the workpiece along a first cutting plane, and a second cutting tool adapted to cut the workpiece along a second cutting plane, the first and second cutting planes defining an inner angle therebetween, the cutting assembly being adapted to cut the workpiece along the first and second cutting planes in a single operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ÉQUIPEMENTS FRONTMATEC INC51 RTE MORISSETTE SAINT-ANSELME G0R 2N0

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergeron, Kevin St-Anselme, CA 2 0
Lemieux, Alexandre St-Anselme, CA 2 11
Wells, Campagna Antoine St-Anselme, CA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00