Hybrid electric vehicle with torque split regenerative braking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11820254
APP PUB NO 20190337391A1
SERIAL NO

15970469

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid electric vehicle having one or more controllers, at least two independently driven electric machines (EMs) that are each coupled to separate drive wheels, and controllers configured to generate a torque split ratio responsive to lateral acceleration and/or unequal friction coefficients detected during braking, and to generate electric power with the motors by regeneratively braking each wheel with unequal torques adjusted by the ratio, such that combined wheel braking torques do not exceed a total braking torque limit for the vehicle. In some configurations, the controller(s) generate the torque split ratio by a predetermined lookup table that maps a plurality of torque split ratios to lateral accelerations, the coefficients, and other parameters. Further arrangements include the controller(s) coupled with sensors that detect wheel slip and yaw rate, and responsive to a braking signal, the controller(s) disengage regenerative braking when the wheel slip and/or vehicle yaw are detected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN ROAD FL4 DEARBORN MI 48126-2701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crombez, Dale Scott Livonia, US 104 1588
Kuang, Ming Lang Canton, US 179 2569
Zhao, Yanan Ann Arbor, US 106 597

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00