Microwave pyrolysis reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11826717
SERIAL NO

16498460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a microwave pyrolysis reactor (1) comprising an inner pipe element (2), a microwave distribution element (3) and a housing (4), wherein the inner pipe element (2) is made of a microwave transparent material and comprises a first open end (5) and a second open end (6); the microwave distribution element (3) is made of a material not transparent to microwaves and is arranged around the inner pipe element (2), and comprises at least one opening (8) for allowing passage of microwaves into the inner pipe element (2); the housing (4) comprises a first inner surface enclosing a first annular space (9) around the microwave distribution element (3) and a port (13) for a microwave waveguide (14) in communication with the first annular space; and wherein the microwave distribution element is in thermal conductive contact with a heat exchange system for removal of heat from the microwave pyrolysis reactor during use.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCANSHIP AS3126 TØNSBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wien, Asgeir Vollen, NO 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00