Catalyst structure for LOHC dehydrogenation reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11826734
APP PUB NO 20220305469A1
SERIAL NO

17539801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a catalyst structure for a liquid organic hydrogen carrier (LOHC) dehydrogenation reactor, including a support, a plurality of channels formed on the support in such a manner that the LOHC may flow therethrough, and an LOHC dehydrogenation catalyst that is coated on the inner surfaces of the channels and is in contact with the LOHC to carry out LOHC dehydrogenation, wherein the hydrogen gas generated from the dehydrogenation is discharged along the channels so that the contact area between the LOHC and the LOHC dehydrogenation catalyst may be increased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGYDAEJEON 305-701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Joongmyeon Daejeon, KR 34 111
Han, Gwangwoo Daejeon, KR 1 0
Kim, Taehong Daejeon, KR 29 14
Lee, Jaemyung Daejeon, KR 22 82
Lee, Sanghun Daejeon, KR 123 410

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00