Grade crossing control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11827260
APP PUB NO 20210053598A1
SERIAL NO

16964662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grade crossing control system includes a controller that receives start and end inputs corresponding to a train traversing an outer approach, determines the difference in time between the start and end inputs, and uses the difference in time to determine a delay period by which activation of a grade crossing warning system will be delayed following detection of the train by a track occupancy circuit in an inner approach in order to compensate for slow moving trains. The start and end inputs for the outer approach may be supplied in different ways including a separate track occupancy circuit for the outer approach, by train detection devices unconnected to the track at the start and end of the outer approach, or by overlapping track occupancy circuits positioned at the start of the outer and inner approaches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY INCONE PENN PLAZA 11TH FLOOR SUITE 1100 NEW YORK NY 10119

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bamfield, Richard Upper Moutere, NZ 8 41
Corbo, Mark Prospect, US 5 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00