Method for optimizing gas oil separation plant parameters to maximize oil recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11827858
SERIAL NO

17022812

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for optimizing the gas-oil separation plant (GOSP) operating parameters in order to maximize the stabilized crude oil recovery in an integrated framework of GOSP operation. The ambient temperature variations daily (day and night) and seasonal (summer and winter) are incorporated to show their impact on liquid recovery. An artificial intelligence model predicts stabilized crude oil recovery for a range of ambient temperatures. The optimal GOSP separator pressures which yield maximum stabilized crude oil recovery are determined for each ambient temperature. The separator pressures of the GOSP may be adjusted to achieve the maximum stabilized crude oil recovery under changing ambient temperatures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YOKOGAWA SAUDI ARABIA COMPANYIBN RUSHD STREET DHAHRAN TECHNO-VALLEY P O BOX 3368 AL-KHOBAR 31952

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Dogail, Ala Dhahran, SA 1 0
Al-Dossary, Badr Al-Khobar, SA 1 0
Al-Naser, Mustafa Al-Khobar, SA 6 3
Gajbhiye, Rahul Dhahran, SA 1 0
Mahmoud, Mohamed Dhahran, SA 62 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00