Mobile continuous mixing apparatus with linearly aligned feed belts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11833714
APP PUB NO 20230191659A1
SERIAL NO

17999456

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A continuous mixer that is installed in the bed of a dump truck. The mixer has a hopper for cement, a pair of belts to move the other mixing materials, and a chute with an auger for mixing the cement and mixing materials with water and depositing the mixture where desired. The hopper stands upright in the bed when the bed is down and tilted at about 45° when the bed is up. An auger at the bottom of the hopper feeds cement to an opening at the bottom of the hopper, The belts sit below the hopper and are oriented with the belts parallel to the ground during operation, The belts feed mixing materials from the bed to a mixing chute below the belts. An auger combines the dry materials and water to form the concrete as they travel the length of the chute to the discharge end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHAVEZ TIRSOLOWELL MA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chavez, Tirso Lowell, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00