Structures formed from high technology conductive phase materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11833745
SERIAL NO

17519863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a bulk product includes the step of coating a particulate conductive phase material with a binder phase, and forming the coated conductive phase material into at least one of sheet stock, tape formed into a bulk material. A method of forming a bulk product includes the step of coating a particulate conductive phase material with a binder phase and forming the coated conductive phase material into a bulk material. The conductive phase material includes at least one of two dimensional materials, single layer materials, carbon nanotubes, boron nitride nanotubes, aluminum nitride and molybdenum disulphide (MoS2). A component is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATIONCHARLOTTE NC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schmidt, Wayde R Pomfret Center, US 228 1725
Sheedy, Paul Bolton, US 124 335

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00