Heat exchange system for vehicle and air conditioning system for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11833884
APP PUB NO 20210008962A1
SERIAL NO

16981770

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It provides an operation part calculating an energy recovered by the heat exchanger in the heat exchanger and energies consumed by the air blower for absorption and the air blower for discharge and determining which of the energy recovered by the heat exchange and the energies consumed by the air blower for absorption and the air blower for discharge is greater, and a control part controlling at least one of the air blower for absorption and the air blower for discharge so that the energy consumed by the air blower for absorption and the air blower for discharge becomes small when the operation part determines that the energy consumed by the air blower for absorption and the air blower for discharge is greater than the energy recovered by the heat exchanger.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONCHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tani, Masakazu Tokyo, JP 50 292

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00