System, method and apparatus for non-mechanical optical and photonic beam steering

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11835841
APP PUB NO 20210048725A1
SERIAL NO

16999815

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example system includes a high-side electrode layer including a number of discrete electrodes and a low-side electrode layer. The system further includes an electro-optic (EO) layer including an EO active material positioned between the high-side electrode layer and the low-side electrode layer, thereby forming a number of active cells of the EO layer. Each of the number of active cells of the EO layer includes a portion of the EO layer that is positioned between one of the discrete electrodes and the low-side electrode layer. The example system further includes an insulator operationally coupled to the active cells of the EO layer, and at least partially positioned between a first one of the active cells and a second one of the active cells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXCITING TECHNOLOGY LLC4161 SPRUCE PINE COURT DAYTON OH 45424

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ataei, Abtin Dayton, US 23 129
McManamon, Paul F Dayton, US 25 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00