Modular cyclone

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11839883
APP PUB NO 20210178405A1
SERIAL NO

17182803

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cyclone sand separator kit, method, and separator, of which the kit includes a cyclone body having an inlet, a fluid outlet, and a solids outlet, the inlet being configured to receive a mixed fluid including a solid portion and a fluidic portion, the solids outlet being configured to receive the solid portion separated from the fluidic portion, and the fluid outlet being configured to receive the fluidic portion separated from the solids portion. The kit includes a plurality of cyclone inserts configured to be positioned in the cyclone body, at least partially between the inlet and the solids outlet and at least partially between the fluids outlet and the solids outlet. The cyclone inserts each define a vortical section configured to induce inertial separation of the mixed fluid, have different geometries including different inner diameters, lengths, angles, underflow outlet sizes, vortex finder placements, or a combination thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERCORP ENGINEERED SOLUTIONS INCCALGARY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bowley, Ryan Thomas Calgary, CA 40 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00