Controlling reactabtlity of water-reactive aluminum

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11840451
APP PUB NO 20220250905A1
SERIAL NO

17730475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Materials, kits, and methods are directed to controlling reactability of activated aluminum to produce hydrogen when exposed to water. For example, a moisture-stabilized material may be treatable with one or more additives to form a water-reactive source of hydrogen. The moisture-stabilized material may include a bulk volume including aluminum, at least one activation metal disposed along the aluminum within the bulk volume, the at least one activation metal more noble than the aluminum, and a salt along at least an outer surface of the bulk volume, the salt dissolvable in water to form an ion-containing solution at a rate faster than a reaction rate of water with the aluminum of the bulk volume.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LTAG SYSTEMS LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Slocum, Alexander H Bow, US 201 4739
Slocum, Jonathan T Bow, US 30 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00