Pipe joint and piping structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11840829
SERIAL NO

17439975

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipe joint (1) comprising: a tubular main body (10) having a flow path inside, which is formed of a resin comprising a copolymer having one or more selected from a vinyl cyanide monomer unit and an acrylic monomer unit, a rubber component, and an aromatic vinyl monomer unit; and a socket section (20a) integrally formed with the main body (10), wherein: the main body (10) has a foamed resin layer (30) and a non-foamed resin layer (50) covering the foamed resin layer (30); the amount of the rubber component in the foamed resin layer (30) as determined by pyrolysis-gas chromatography/mass spectrometry is within a specific range; the amount of the rubber component in the non-foamed resin layer (50) is within a specific range; and a ratio (La/La) of length (La) from a base end (21a) to an opening end (22a) of the socket section (20a) to a thickness (da) of the socket section (20a) at the opening end is 2.0 or more and 10.0 or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEKISUI CHEMICAL CO LTDOSAKA-SHI OSAKA 530-8565

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hisashuku, Daiki Ritto, JP 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00