Device and method for selecting optimal boiler combustion model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11846416
APP PUB NO 20210010671A1
SERIAL NO

16888567

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device and method select an optimal boiler combustion model from among a plurality of boiler combustion models for boiler combustion to update a memory in which the boiler combustion models are stored. The device includes a memory configured to store first boiler combustion models that are derived in advance and second boiler combustion models that are derived in advance; and a processor configured to select an optimal boiler combustion model from among the first and second boiler combustion models and to update the memory according to characteristics of the selected optimal boiler combustion model. The processor may further generate a third boiler combustion model for the combustion of the boiler to select the optimal boiler combustion model from among the first to third boiler combustion models and verification data for model verification through the latest data measured in the boiler and data on basic characteristics of the measured data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTDSEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maeng, Jwa Young Yongin-si, KR 10 2
Na, Sang Gun Yongin-si, KR 20 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00