Steam cooker

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11846430
SERIAL NO

17468075

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam cooker includes a main body which includes an upper wall, a lower wall, side walls, and a rear wall, a cavity formed by the upper wall, the lower wall, side walls and the rear wall, a steam generator to generate steam, and a supply pipe to connect the steam generator and the cavity to supply the generated steam into the cavity. The supply pipe includes a first supply pipe which includes a first end connected to the steam generator and a second end, and a second supply pipe includes a first end connected to the upper wall of the cavity and a second end to be connected to the second end of the first supply pipe, and includes a condensation water guide portion formed to be inclined to prevent condensation water generated therein from being introduced into the cavity when the generated steam is supplied into the cavity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Pung Yeun Suwon-si, KR 32 314
Lee, Se Hun Suwon-si, KR 14 70
Oh, Dong Jin Yongin-si, KR 12 64
Park, Geun Yong Hwaseong-si, KR 19 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00