Solid insulation material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11848123
APP PUB NO 20180204649A1
SERIAL NO

15743811

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to insulation. Various embodiments thereof may include a solid insulation material and/or a formulation for production of an insulation system. For example, a formulation for an impregnating agent may include: an impregnating resin comprising a cycloaliphatic epoxy resin having a viscosity of less than 1500 mPas at impregnation temperature; and a curing catalyst deposited in the solid insulation material. The curing catalyst may be reactive toward the cycloaliphatic epoxy groups of the cycloaliphatic epoxy resin in the formulation of the impregnating agent but be sufficiently reactively inert with respect to the functional groups of the tape adhesive likewise present in the solid insulation material to confer storage stability to the solid insulation material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INNOMOTICS GMBH90441 NÜRNBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Übler, Matthias Ursensollen, DE 25 36
Huber, Jürgen Erlangen, DE 30 33
Schirm, Dieter Breitengüssbach, DE 21 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00