Vehicle steering structure and all-terrain vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11851131
SERIAL NO

17381325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle steering structure includes a steering column, a bearing, a frame and a wheel steering assembly. The bearing includes an outer ring with an inner spherical surface and an inner ring with an outer spherical surface, the inner ring is arranged in the outer ring, and an outer circumference of the outer ring is connected to the frame. The steering column passes through the inner ring, and has a first end connected to the steering control part and a second end connected to the wheel steering assembly. The vehicle steering structure may be applied in an all-terrain vehicle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEGWAY TECHNOLOGY CO LTDNO 395 SOUTH XIACHENG ROAD WUJIN NATIONAL HIGH TECH INDUSTRIAL DEVELOPMENT ZONE CHANGZHOU CITY JIANGSU PROVINCE 213100 CHANGZHOU CITY JIANGSU PROVINCE 213100

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Xiang Suzhou, CN 1551 13938

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00