Waste water incinerating method and apparatus therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11851348
APP PUB NO 20230159351A1
SERIAL NO

17054736

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A waste water incinerating method comprising supplying waste water to an evaporator to evaporate the waste water, supplying an evaporator top discharge stream discharged from the evaporator to an incinerator to incinerate the discharge stream, mixing two or more incinerator discharge streams including a first incinerator discharge stream and a second incinerator discharge stream discharged from the incinerator to form a mixed discharge stream, and heat-exchanging the mixed discharge stream and a fresh air stream in a first heat exchanger, wherein the first incinerator discharge stream is passed through a second heat exchanger, then mixed with the second incinerator discharge stream to form the mixed discharge stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Tae Woo Daejeon, KR 270 1153
Lee, Sung Kyu Daejeon, KR 146 366

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00