Device for continuously producing sugar by hydrolyzation using lignocellulosic raw material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11851721
APP PUB NO 20200377962A1
SERIAL NO

16894353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present utility model provides a device for continuously producing sugar by hydrolyzation using a lignocellulosic raw material. The device comprises: an acid solution output unit, a raw material mixing unit, a feeding unit, a main reaction unit, and a discharging unit. The device is a genuine continuous hydrolyzation sugar-producing device, which can achieve continuous feeding, continuous reaction, and continuous discharging in terms of time, and can effectively reduce labor intensity, increase production efficiency, and increase sugar yields and sugar concentrations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECO BIOMASS TECHNOLOGY COMPANY LIMITED23/F 363 JAVA ROAD NORTH POINT HONG KONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chow, Connie Hiu Ying Hong Kong, CN 3 0
Lu, Junde Hong Kong, CN 3 0
Siu, Kam Shing Hong Kong, CN 6 4
Xu, Bin Hong Kong, CN 368 1936

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00