Hybrid heat transfer assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11852068
SERIAL NO

17832980

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid heat transfer assembly includes operating equipment having a coolant loop including a cooling fluid inlet and a cooling fluid outlet. A radiator has a radiator inlet connected to the cooling fluid outlet, and a radiator outlet connected to the cooling fluid inlet. A radiator fan proximate the radiator directs air across the radiator. A chiller includes an evaporator having an evaporator inlet connected to the cooling fluid outlet, and an evaporator outlet connected to the cooling fluid inlet. A compressor is connected to the evaporator, a condenser is connected to the compressor, and an expansion valve is connected to the condenser and evaporator. A refrigerant loop connects the evaporator and compressor, the condenser and compressor, and the expansion valve to the condenser and the evaporator. A condenser fan proximate the condenser directs air across the condenser.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • L&M RADIATOR, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cedar,, Jr Charles Eugene Chisholm, US 4 9
Morgan, Aaron Patrick Britt, US 6 10
Takes, Nicholas F Hermantown, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00