Dual saturable reactor power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11855559
APP PUB NO 20230145101A1
SERIAL NO

17520872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply system includes a first saturable reactor electrically connected to a first AC phase input, to a second AC phase input, and to a third AC phase input. The first saturable reactor is electrically connected to a first DC output. A second saturable reactor is electrically connected in parallel with the first saturable reactor to the first AC phase input, to the second AC phase input, and to the third AC phase input. The second saturable reactor is electrically connected to a second DC output. A reactor controller can be operatively connected to the first saturable reactor and to the second saturable reactor to regulate DC output voltage to the first and second DC outputs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATIONONE HAMILTON ROAD WINDSOR LOCKS CT 06096

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koenig, Andreas C Rockford, US 60 141
Patel, Dhaval Schaumburg, US 134 1026

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00