Systems and methods for filling a proppant silo

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11858760
SERIAL NO

18325391

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a base configured to be positioned on a ground. The base includes a first conveyor configured to convey a granular material. The system also includes a derrick coupled to the base. The derrick is configured to be oriented substantially horizontally when the system is in a folded state. The derrick is configured to be oriented substantially vertically when the system is in an unfolded state. The derrick includes a second conveyor configured to receive the granular material from the first conveyor and to convey the granular material. The system also includes a first arm coupled to the derrick. The first arm includes a third conveyor configured to receive the granular material from the second conveyor and to convey the granular material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLARIS OILFIELD SITE SERVICES OPERATING LLC9811 KATY FREEWAY SUITE 700 HOUSTON TX 77024

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lambert, Scott The Woodlands, US 15 530
Martinez, Jeffrey The Woodlands, US 3 7
Weinstein, Jeremy Tomball, US 7 223

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00