Iron nitride compositions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11859271
SERIAL NO

16610285

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example composition may include a plurality of grains including an iron nitride phase. The plurality of grains may have an average grain size between about 10 nm and about 200 nm. An example technique may include treating a composition including a plurality of grains including an iron-based phase to adjust an average grain size of the plurality of grains to between about 20 nm and about 100 nm. The example technique may include nitriding the plurality of grains to form or grow an iron nitride phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REGENTS OF THE UNIVERSITY OF MINNESOTA200 OAK STREET SE SUITE 600 MCNAMARA ALUMNI CENTER MINNEAPOLIS MN 55455

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiang, YanFeng Minneapolis, US 43 240
Liu, Jinming Minneapolis, US 42 58
Ma, Bin Roseview, US 334 7799
Mehedi, Md Minneapolis, US 6 2
Wang, Jian-Ping Shoreview, US 94 795
Wu, Yiming Shoreview, US 35 184
Zhang, Delin Minneapolis, US 11 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00