Additive manufacturing system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11865620
APP PUB NO 20210078078A1
SERIAL NO

16959572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additive manufacturing system, comprises an energy source device for providing a first energy beam and a second energy beam; and a forging device comprising a forging head. The first energy beam and a substrate are configured to move relative to each other to fuse at least a portion of a material added to the surface of the substrate for forming a cladding layer on the substrate. The forging head is configured to forge the cladding layer during formation of the cladding layer. The second energy beam is configured to heat a forging area of the cladding layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Hai ShangHai, CN 7 5
Rasch, Lyle Timothy Fairfield, US 13 115
Wei, Bin Niskayuna, US 144 3552
Wu, Yingna ShangHai, CN 11 4
Wu, Yong ShangHai, CN 234 875
Zhai, Zirong ShangHai, CN 11 32
Zhong, Dalong ShangHai, CN 35 310

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00