Bike lock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11873665
SERIAL NO

17458592

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure discloses a bike lock used to lock the bike to prevent bike theft. A first shaft and a second shaft of the bike lock are connected to the handlebar and the front wheel of the bike, respectively. When the bike lock is in a locking mode, the first shaft is not linked to move with the second shaft, preventing the user from controlling the front wheel by the handle effectively. When the bike lock is in an unlocking mode, the first shaft is linked to move with the second shaft. The first shaft can be linked to move with the second shaft by two different linkage mechanisms. One is to link the first shaft with the second shaft with a pin; the other is to firmly engage an engaging structure of one of the shafts to another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEAM YOUNG TECHNOLOGY CO LTD18F -1 NO 400 HUANBEI RD ZHONGLI DISTRICT TAOYUAN CITY 32070

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Chih-Hung Taoyuan, TW 33 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00