System for manufacturing thermoplastic parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11890824
APP PUB NO 20230143940A1
SERIAL NO

17768201

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for manufacturing a thermoplastic part from a blank part having a first moulding member and a second moulding member which are configured to cooperate together. A first heating body configured to heat the first moulding member and conductively heat the blank part. Two thermal insulation members are configured to cooperatively define a closed cavity in which at least the moulding members and the first heating body are arranged. A casing defining an internal volume in which at least the moulding members, the first heating body and the thermal insulation members are arranged, and a suction member is configured to lower the internal pressure in the internal volume to compress the preform part between the moulding members.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS ATLANTICZONE INDUSTRIELLE DE L'ANCIEN ARSENAL ROCHEFORT 17300

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deruelle, Romain Albert, FR 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 6, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00