Polymer-based substrate and method for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11898056
APP PUB NO 20200290084A1
SERIAL NO

16892531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polymer-based substrate is proposed, which in particular is electrostatically coatable, wherein the substrate comprises a substrate base body made using a polymeric material and a coating applied to a surface region of the substrate base body, wherein the polymeric material comprises a first polymer, wherein the coating comprises a matrix polymer and an additive which is dispersed in the matrix polymer and reduces the surface resistance of the coating, said additive having a proportion that is selected such that the specific surface resistance of the coating is about 1010 Ohm or less, and wherein the matrix polymer is selected such that it is compatible with the first polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENSINGER GMBH71154 NUFRINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Möller, Michael Cham, DE 17 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00