Burner tube

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11898746
SERIAL NO

17310532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method uses a combustor and gasifier to burn a primary dirty fuel, such as waste materials or high-polluting fossil fuels, and a secondary low-polluting fuel, such as biomass fuels, for co-generation of electricity while reducing harmful emissions. The primary fuel is burned at least partially through the use of an improved burner tube. Dirty exhaust from a combustor is scrubbed by a gasifier by reforming the combustors exhaust gases into a clean-burning producer gas (syn-gas). The secondary fuel and oxygen are added to the dirty exhaust in the gaslifier to create gas, char and ash. The gas powers an engine or turbine that turns a generator, or a boiler, Stirling engine, or Organic Rankine Cycle power plant, and releases a cleaner exhaust.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THIESSEN RANDALL JTOLEDO IA 52342

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Thiessen, Randall J Toledo, US 11 55
Thiessen,, Jr LaVoy M Parker, US 5 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00