Burner system and process for natural gas production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11898747
APP PUB NO 20210341141A1
SERIAL NO

17162309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner apparatus and process are described. The burner apparatus includes an inlet chamber in communication with a combustion chamber. The combustion chamber has a cylindrical shape defining a longitudinal axis and a radial direction orthogonal to the longitudinal axis. The combustion chamber has an upstream end and a downstream end, and an air inlet is disposed in the inlet chamber. A pilot, a fuel gas inlet, and a refractory material are disposed in the combustion chamber downstream of the air inlet. A mixed gas inlet is positioned downstream of the fuel gas inlet and the pilot in the combustion chamber. The mixed gas inlet includes a manifold having an inlet, a body, and a plurality of nozzles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONEYWELL INTERNATIONAL INC855 SOUTH MINT STREET CHARLOTTE NC 28202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arnold, Kenny Tulsa, US 1 0
Whyman, William J Tulsa, US 22 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00