Subway hybrid-energy multifunctional-end-integrated heat pump system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11898779
SERIAL NO

17274998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A subway hybrid-energy multifunctional-end-integrated heat pump system includes energy and user ends and hot water tank. A first energy end includes a capillary-tube front-end heat exchanger and a subway capillary heat pump unit. A second energy end includes a solar panel. A third energy end includes an air-cooled heat pump unit. The user end includes air conditioner, hot water supply, underfloor heating, and radiator heating ends. The first, second and third energy ends connect to the hot water tank. A water outlet is connected to the air conditioner, hot water supply, underfloor heating, and radiator heating ends. Water outlets of the air conditioner, underfloor heating, and radiator heating ends are respectively connected to the first, second and third energy end through a return pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QINGDAO UNIVERSITY OF TECHNOLOGYNO 777 JIALINGJIANG ROAD ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE QINGDAO SHANDONG 266520

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Songtao Qingdao, CN 5 0
Ji, Yongming Qingdao, CN 1 0
Liu, Guodan Qingdao, CN 1 0
Tong, Li Qingdao, CN 57 250
Tong, Zhen Qingdao, CN 8 17
Wang, Haiying Qingdao, CN 49 373

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00