Electric furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11898797
SERIAL NO

16468615

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an electric furnace including: a furnace body that includes an electrode; and a slag holding furnace that is configured to hold molten slag in a molten state and is capable of pouring the molten slag into the furnace body when tilted, in which the furnace body includes a cylindrical furnace wall, a furnace cover that is provided at an upper end of the furnace wall, a furnace bottom that is provided at a lower end of the furnace wall and includes a deep bottom portion and a shallow bottom portion as a region having a height of 150 mm to 500 mm from a deepest point of the deep bottom portion, and a slag pouring port that is provided at the furnace cover and through which the molten slag is poured from the slag holding furnace, the slag pouring port overlaps the shallow bottom portion in a plan view, and the area ratio of the shallow bottom portion to the furnace bottom in a plan view is 5% to 40%.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO 100-8071

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arai, Takashi Tokyo, JP 236 2194
Harada, Toshiya Tokyo, JP 9 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00