Combined mounting/electrical distribution plate for powering internal control rod drive mechanism (CRDM) units of a nuclear reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11901091
SERIAL NO

17366997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distribution plate (PDP) sits on top of a support plate. Control rod drive mechanism (CRDM) units are mounted on top of the PDP, but the PDP is incapable of supporting the weight of the CRDM units and instead transfers the load to a support plate. The PDP has receptacles which receive cable modules each including mineral insulated (MI) cables, the MI cables being connected with the CRDM units. The PDP may further include a set of hydraulic lines underlying the cable modules and connected with the CRDM units. The cable modules in their receptacles define conduits or raceways for their MI cables and for any underlying hydraulic lines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BWXT MPOWER INC11525 N COMMUNITY HOUSE RD SUITE 600 CHARLOTTE NC 28277

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shargots, Scott J Forest, US 44 137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00