Method for manufacturing powder magnetic core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11901117
SERIAL NO

17343941

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a powder magnetic core, the method including: forming a soft magnetic powder (SMP) layer by putting an SMP having a surface on which an insulating coating film is formed into a space surrounded by a lower punch and a die; forming a pressed powder by compressing the SMP layer in the die by the lower punch and an upper punch; and causing the pressed powder and the die to slide relative to each other and then removing the pressed powder from the die is provided. In forming the SMP layer, a different powder different from the SMP is put into the space before and after the SMP is put into the space and a different powder layer having a spring back rate higher than that of the SMP layer by 0.6-1.1% is formed on upper and lower sides of the SMP layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Kohei Nagoya, JP 12 168
Nagaki, Hiroto Toyota, JP 2 0
Nakatani, Kazumichi Toyota, JP 5 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00