Apparatus and method for capturing renewable and non-renewable energy from biodegradable and non-biodegradable municipal waste

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11905476
SERIAL NO

18058466

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Exemplary embodiments provide a pyro gasifyer apparatus and method that may be used in a pyro-gasification system. According to an example embodiment, a loading unit may receive waste and a pyro gasifier unit may receive the waste and convert it into purified syngas through a two-stage process using exhaust gas and a gasifying agent. An engine may receive the purified syngas and generate the exhaust gas, such that a gasifying unit may generate the gasifying agent using energy provided by the exhaust gas. A control unit may monitor and control the amount of the purified syngas, the exhaust gas, and the gasifying agent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE NAVY875 N RANDOLPH ST OFFICE OF NAVAL RESEARCH ROOM 522 ATTN CODE OOCCIP ARLINGTON VA 22203-1995

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Molintas, Henry Olney, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00