Wheel loader

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11913190
APP PUB NO 20210317632A1
SERIAL NO

17271748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a wheel loader capable of reducing erroneous determination of rear wheel lifting. The wheel loader 1 includes a controller 5 for determining a rear wheel lifting state where rear wheels 11B are lifted upwardly. The controller 5 is configured to, when a temporal change rate α of a bucket operation angle becomes a temporal change rate of a bucket operation angle necessary for a tilt operation of a bucket 23 during an excavation operation and a temporal change rate β of a vehicle body inclination angle estimated by the controller 5 becomes a temporal change rate of an obliquely upward inclination state of a rear vehicle body with respect to a front vehicle body, turn on a correlation flag indicating a correlation between an operation state of the bucket 23 and an inclination state of a vehicle body to determine a rear wheel lifting.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Kazuyuki Kobe, JP 94 1011
Urimoto, Yoshikazu Kakogawa, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00