Plunger, pump, and liquid analysis device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11920582
APP PUB NO 20220364552A1
SERIAL NO

17789146

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The plunger of the present disclosure includes: a plunger main body section that is made of sapphire, has a pillar shape, and includes a non-penetrating fitting hole extending in a central axis direction from one end portion; a core portion that is inserted into the fitting hole and has a higher thermal conductivity than sapphire; and a joint layer that is interposed between an inner peripheral surface and a bottom surface of the fitting hole of the plunger main body section, and an outer peripheral surface and a tip surface of the core portion, the joint layer being configured to bond the plunger main body section and the core portion. A pump includes the plunger. A liquid analysis device includes the pump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOCERA CORPORATIONFUSHIMI-KU KYOTO-SHI KYOTO 612-8501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsubokura, Satoru Kyoto, JP 7 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00