System and method for controlling a multi-state electrochemical cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11926908
APP PUB NO 20220243346A1
SERIAL NO

17727436

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for controlling an electrochemical production process includes a variable controllable power circuit and an electrolytic cell. The cell includes two electrodes and operates in different states dependent on the potential difference across the electrodes. The system includes a power circuit controller that causes the power circuit to apply a given potential difference across the electrodes to initiate operation of the cell in the one of multiple possible states associated with the given potential difference. The possible states include a production state associated with a first non-zero potential difference in which a product of interest is produced, and an idle state associated with a second non-zero potential difference in which the product of interest is not produced. A monitoring and control subsystem maintains a predefined set of production process conditions, including a predefined operating temperature range, while the cell operates in both the production state and the idle state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AEON BLUE TECHNOLOGIES LLC1704 NICKERSON STREET AUSTIN TX 78704

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ua, Cearnaigh Deóis Chiaráin Mac Séamuis San Marcos, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00