Semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11929605
APP PUB NO 20220311233A1
SERIAL NO

17637148

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

First and second output transistors are connected in series between a power supply terminal and a ground terminal through an output node connected to an output terminal. An output transistor control circuit is arranged corresponding to at least one of the first and second output transistors and is configured to input a voltage at the output terminal to the gate of the first output transistor at a time of occurrence of disconnection of the power supply terminal and input the same to the gate of the second output transistor at a time of occurrence of disconnection of the ground terminal. The first output transistor has a conductivity type to turn off when a power supply voltage is input to the gate, and the second output transistor has a conductivity type to turn off when a ground voltage is input to the gate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kojima, Tomokazu Tokyo, JP 36 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00