Process and system for reforming a hydrocarbon gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11932538
APP PUB NO 20200377365A1
SERIAL NO

16766415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for reforming a hydrocarbon feed stream comprising a hydrocarbon gas and steam, said process comprising the steps of: a) in a synthesis gas generation reactor carrying out a reforming reaction of the hydrocarbon feed stream over a first catalyst, thereby forming a first synthesis gas; b) providing a heated CO2 rich stream to a post converter comprising a second catalyst; and c) in said post converter carrying out a methanation, steam reforming and reverse water gas shift reactions of the first synthesis gas and the heated CO2 rich stream to produce a product synthesis gas, wherein said second catalyst is heated electrically by means of an electrical power source. The invention moreover relates to a system arranged to carry out the process of the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOPSOE A/SHALDOR TOPSØES ALLÉ 1 KGS LYNGBY 2800

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Østberg, Martin Tune, DK 17 63
Mortensen, Peter Mølgaard Roskilde, DK 60 133

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00