High density polymers based on norbornadiene

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11932724
SERIAL NO

17220282

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel family of cycloalkanes compounds having one or more allylidene functionalities which can be used to create cross-linked thermosets and thermoplastics having thermal stability. An example heptacyclo [6.6.0.02,6.03,13.04,11.05,9.010,14] tetradecane (HCTD) complex with terminal allylidene groups at the 7- and 12-positions (HCTD-7,12-diallylidene) was generated from norbornadiene via an efficient six-step synthesis. Thermal polymerization at temperatures ranging from 160 to 240° C. yielded a robust cross-linked material with thermal stability up to 485° C. in air, a glass transition temperature of 377° C., and a char yield (600° C.) of 56% in air. Applications include heat resistant composites utilized in the aerospace, electronic, automotive and textile industries.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE NAVYNAVAL UNDERSEA WARFARE CENTER DIVISION KEYPORT 610 DOWELL RD BLDG 1003 KEYPORT WA 98345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harvey, Benjamin G Ridgecrest, US 87 130
Rosenkoetter, Kyle E Ridgecrest, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00