Anti-surge resistor and fabrication method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11935675
APP PUB NO 20240006098A1
SERIAL NO

17930417

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An anti-surge resistor and a fabrication method thereof are provided. The current anti-surge resistor includes a substrate made by a varistor material, a resistance layer disposed on the substrate, a first terminal electrode, and a second terminal electrode. In the fabrication method of the current anti-surge resistor, at first, the substrate made by the varistor material is provided. Then, the resistance layer is formed on the substrate to provide a main body, in which the main body includes the substrate and the resistance layer, and has two opposite terminals. Thereafter, the first terminal electrode is formed on one terminal of the main body, and the second terminal electrode is formed on the other terminal of the main body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAGEO CORPORATIONKAOHSIUNG CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsiao, Shen-Li Kaohsiung, TW 28 18
Lin, Kuang-Cheng Kaohsiung, TW 8 31
Wang, Ren-Hong Pingtung County, TW 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00