Lower structure of electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11945512
APP PUB NO 20220306213A1
SERIAL NO

17590822

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric vehicle includes a floor panel formed with a floor tunnel; a transmission; a transmission support member; an inverter attached to a case of the transmission; a battery unit disposed behind the transmission and on an outer side in a vehicle width direction of the floor tunnel; and a harness disposed such that an intermediate portion between a first end portion connected to the inverter and a second end portion connected to a front end portion of the battery unit 4 extends across the floor tunnel from inside to outside thereof. The battery unit has a substantially rectangular shape in a bottom view, and a corner on the floor tunnel side of a front end portion of the battery unit is cut out to form a free space between the front end portion of the battery unit and a portion of the floor tunnel behind the transmission support member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATIONFUCHU-CHO AKI-GUN HIROSHIMA 730-8670

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katayama, Kenji Hiroshima, JP 24 303
Nakayama, Shuntaro Hiroshima, JP 4 17
Ohga, Muneyuki Hiroshima, JP 3 29
Sumita, Ryuhei Hiroshima, JP 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00