Electrochemical method for the production of graphene composites and cell for conducting the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11945722
SERIAL NO

17567274

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making an electrically conductive composite includes applying graphene oxide to at least one non-conductive porous substrate and then reducing the graphene oxide to graphene via an electrochemical reaction. An electro-chemical cell for causing a reaction that produces an electrically conductive composite includes a first electrode, a second electrode, an ion conductive medium, electrical current in communication with the first electrode, and an optional third electrode having a known electrode potential. The first electrode contains at least one layered electrocatalyst, which includes at least one non-conductive porous substrate coated with graphene oxide and at least a first and second active metal layer comprising a conductive metal in contact with the non-conductive porous substrate coated with graphene oxide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OHIO UNIVERSITY340 WEST STATE STREET UNIT 14 ATHENS OH 45701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Botte, Gerardine G Athens, US 32 223
Wang, Dan Athens, US 314 948

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00